So a big apology is needed for all my blog readers. since returning from the trip I/we have been in constant motion. (sleep has been optional) But fear not, Blogging for the Olson's is back thanks to a big kick in the pants by the Johnson's.
I do want to say thank you again to all those that provide a way for me to go on this trip. It was a true heart changing blessing. With out support of my friends this would not have happened for me. I'm still remembering some of the areas that God touched me and I'm trying my best to becoming a better husband, father and Christian.
Well back to the story....
Rewind: So Saturday was a travel adventure(see earlier post) - SFO (delayed) - Heathrow (London) missed flight - world wind adventure in downtown London (just to get a passport stamp), tiring - Another flight to Kiel - BUMPY. 1.5 hour bus ride, restful - arrive at the ship - breath taking - Sleep, welcomed!
Sunday - Woke up to a small bed room and a new guest. I was rooming with Dan and then a new friend from Germany - Berkhart. Morning came early, but due to the long travel day (24hours straight) I acclimated to the time change really quickly. Our room was in the family quarters so it ahd a in room shower and sink(Nice!)

Well Sunday we found out is "get off the ship day" - it was pretty empty. The few people we talked to said that due to the hard work on the ship during the week, Sunday is people's day to escape. We did attend church...worship in english (nice- I was worried about language barriers but it seems that us american's are the only group that speaks only one language.) then Pastor Klaus from Berlin spoke about 'God changing our world view from "us centered" to "Jesus Centered".
Col 1:15-16
"15He is the image of the invisible God, the firstborn over all creation. 16For by him all things were created: things in heaven and on earth, visible and invisible, whether thrones or powers or rulers or authorities; all things were created by him and for him."
Here is a shot of the chapel. The floor has cardboard over it to protect the new wood underneath. Its make shift since each of the different sections of the boat is scheduled to finish at different times.
After lunch, since the boat was empty and we were in a foreign country - site seeing (I know all my supports are like - did we send Jonathan on a trip to Germany or a missions trip) Well the week has just begun and my experiences with our small Team from Venture was a mission of its own.
Let me stop and tell you a little about our team:
Dan - Venture missions pastor and our translator (helped a lot) he is also a missionary to the Kurds of northern Iraq. Lived in Germany for 9 years to train for work in Kurdistan. Since there were no direct english/kurdish language translations. He is also a living miracle (like me) - Lung and heart transplant 11 years ago I believe.
Sterling - construction worker - battled his own life demons and God saved him from a tragic fall (4 stories)
Laurie - eldest member of our team, brave lady who has battled through a lot to finally allow God to work in her life
Rod - Church usher with a big heart - also a small plane pilot, retire 30 years from IBM.
Emily - kindergarten teacher with a heart for Christ.
and me
Oh yea, back to Sunday - Well we heard that there was a festival in town, so off we went - 40deg never stopped anyone.
Here is the Ship - the Logos Hope:
I was there - I swear!

Little shopping district.
In town we took in a little festival - medieval times style. There was good food, including brats galore and waffles on a stick. We visited this old church in town:


After the walk through the city, we were back for dinner and some internet and preparations for the first work day, Monday.
So Monday, we head off to the Project worker coordination room for our assignments. There is lots to complete on the ship so they can complete their PSSC license (Passenger Ship Safety Certificate). We arrived in the office and asked what we could do- well we had a carpenter - Sterling, and electrician and handy man - Rod, Dan said he could weld, Emily said she was up for painting, Laurie offered to help the people cleaning the Heavy Fuel Oil tank (more on that later), and me, well I said I was an engineer and had worked on car engines before - So I guess I fit the bill for engine duty - off to the engine room. Me and my big mouth. It was a blessing because I really enjoyed my work during the week and the people I met were just great.
First job - get into uniform. Coveralls all week. They have a whole bunch of loaner clothes so i grabbed some coveralls and steel toed boots, dressed and headed to meet with the Engine room project leaders. - Jana (from germany) and Emily (from the States). These were two tough women that held there own among the engine room men. I get to work with Harold and Karl on engine duty. First order of business - removal of one of the engine heads (valve and rocker assembly) This was a dream - get to do missions work and work on engines! So the ship is powered by 4 4000 horse power each diesel engines. Engine #1 and 2 were already rebuilt back when OM first bought the ship. We were on engine 3. One head was out and the cylinder wall was being honed by George (from England - audio engineer for concerts - nice guy) I was paired with Karl and Micheal (both of the states - Karl from Alaska - long time marine engineer and also a staff member of the Logos ship before it crashed in Argentina and Micheal - from seattle, just started his 2 year stay on the ship.) Our first job was to remove all the connections and then remove the rocker arm and start the process to remove the head completely - our engine had a broken connecting rod. But why not do a complete overhaul if you have to take the whole thing apart to get to the connecting rod.
Hydraulic compressors - no torque wrenched used on marine engines, everything is on the BIG scale. So we used these hydraulic compressors to stretch the bolt until the nut was free to move by hand - ~10,000psi.
closer view - see all that grease - covered everyday.
Rocker arm - massive - weighed a couple hundred pounds.
The removal process took two days. I really got slow down and enjoy my work days - something i can't do at my current job. We were on union time - ie we worked until break, the we stopped right at 10am for coffee - 15min and then back down until lunch - 1 hour - back to work till 2:30 - break again and then off at 5pm. It was so refreshing to enjoy my work day. At home I battle every minute of the day, but this allowed me to really understand my job and get to know the guys I was working with. Our first lunch break - we finally found out where all the people were - man the line was LONG. People everywhere - 250 or so are on the ship currently for the building process. People from all over. Lots of day workers come in to volunteer on the ship from Germany and Kiel in particular. Then there are the project works (just a few during our stay), staff, and long term workers(3 month, 1 year, 2 year stays) I mostly worked with Karl and Micheal, Toby (Germany) and Harold (OM employee from the Netherlands but now lives in South Carolina)
The days were busy - each day new work on the engine - removal, cleaning and dismantle and then rebuild. Two days I spent lapping valves, my engine head and then another engine head. A couple days cleaning the engine and another engine. Another day helping with the engine rebuilding. and the last day - HFOT cleaning - more below.
My engine
Me and my engine - love the coveralls. it was extremely loud in the engine room(hence the ear muffs) what with the generators running, welding being done on the floor, George - in the back ground - honing the cylinder walls, engine parts being worked on in the machine shop, machine shop being dismantled, etc.
another head for valve lapping (basically each valve gets custom fitted to the valve seat - this is done with progressively finer powders - like sandpaper in oil - that is used to remove a small amount of material each time the valve is rotated in the engine head.)
Cleaned and ready for rebuild
So at this time my readers are all bored of all this engine talk so I thought I'd throw in some general shots from the boat.
My room mate - Berkhart - from Germany. Had welding skills, so he worked with a group removing, and rebuilding the floor in the engine room and repositioning the all of the pipes on this side of the engine room. This was to make way for some new heat exchangers. He was a very nice guy, loves God and my wake up call every morning.
Sea water heat exchanger pipes
Stairs, stairs everywhere. The ship has 9 levels and so we were walking stairs all the time
a picture of the bakery. They made fresh bread every day we were on the ship, sometimes multiple times a day. It was great. The food on the ship is excellent and hats off to chef Andy and the galley crew.
Kids playland- this life raft is filled with balls and the kids of the families on the ship were constantly running and jumping into the balls, throwing them, etc.
Book store (very condensed). This section is for the visitors that come to the "open Ship' nights every Friday. The Ship opens up to the community each Friday for tours and progress reports to allow the community an opportunity to see whats going on and how they can help.
here is the future home of the Logos Hope theater - part of the Logo Hope experience Level - Level 4 on the ship will be the experience level for visitors to the ship. hundreds of people will visit the ship at each port. the ship will lead the visitors through a number of sections including this theater and also a massive book store. The ships goal at each port is to share Christ. This is accomplished through theater performances, skits, conferences for women, youth, pastors, etc. also a massive book store. The ship will carry thousands of books in tons of languages to meet the needs of the "lost" at each port of call.
This is another shot of the theater section. The theater use to be where the cars were stored for the ferry. The big opening back door has been closed off and sealed and then this stage section built up.
Material storage - there is so much work being done that there is massive amounts of material stored on deck 4. drywall, lumber, flooring, metal, etc.
Dan - cutting metal for his racks.
Dan's racks - dan worked in the hull of the ship where all of the staff suitcases/luggage will be stored. He was cutting and welding in this dusty hole all week. He even lit his favorite shirt on fire during one cutting experience.
Emily - she donned some ear muffs and climbed into the corners of the engine room for paint striping, cleaning and priming. It was really tough getting into all of the corners to clean off the engine soot and then stripping of the rusted paint to make sure a new layer of paint could be applied.
Rod - showing me where his wall is being built. Rod worked in the staff lounge, helping build out one section.
Staff Louge at the back of the ship. Lots of work to be done.


Sterling - worked first in the staff lounge putting in windows, then worked in the hull area above Dan putting his carpenter skills to good use, building storage shelves.
More to come - hold tight till thursday.